Monday 25 October 2010

drains and floors.

Now the bricks are up to a level damp course, as the house is built on a gradient rising from fron to back, the drainage both rainwater and foul have been put in.





the next step is to lay the beam and block floor, a straight forward job, the beams come in standard sizes, so can be bought and cut down to size before you take delivery. They are simply layed from front to back in verticle lines with concrete blocks dropped in-between.
The last pictures are of Mel and me standing at our front door.

No comments:

Post a Comment